Site Preparation for Drilling Rig
The site is first stripped of top soil and leveled. Following is a 100x100 mud pit. Once the pit is complete it is finished by installing a 5x5 wooden cellar box directly under the oil rig location. The cellar box is for circulating mud/water so there is no erosion under the substructure.